PROJECTS

Hunters Hill High School Project

Constructed two lift shafts for improved accessibility, including form, reo, and pour for lift pits, suspended infill slabs, and bondek roof slabs. Completed blockwork, core fill, and face brickwork.

World Gym North Parramatta

Completed 36 pad footings for structural steel columns, lift shaft pit and walls, blockwork, core fill, and a suspended bondek lid.

Gosford Regional Library Project

Completed a 1300m² level 3 suspended slab requiring 500m³ of concrete, a feature wall with a burnished finish, and blockwork. A team of 24 concreters executed the project.

Chatswood McDonald’s

Installed 260 meters of service trenches, new entry stairs and ramp, stair shaft, and refrigeration room slab. The project was completed on a fast-tracked timeline.

Tara on Park Project

Completed level 2 and 3 installations, covering 800m² each with 180m³ of concrete. Installed the roof slab and handled all placing and finishing, including step-downs, wet areas, hobs, and fire stairs.

Baja Shelf in Georges Hall

Completed form, reo, and pour for a baja shelf integrated into an existing pool.